Search
Products
#XJ15 Double-J Control Joint
Expanded flange control joint with a taped reveal for a clean finish#XJ15 Expanded Flange Control Joint (Double-J) is used to relieve stresses in large plastered areas of walls, ceilings, and stucco…
#XJ15 Zinc Double-J Control Joint
Corrosion resistant Expanded flange control joint with a taped reveal#XJ15 Expanded Flange Control Joint (Double-J) is used to relieve stresses in large plastered areas of walls, ceilings, and stucco…
093 Zinc Control Joint (ZNCJ)
Drywall or veneer plaster control joint
ClarkDietrich 093 Zinc Control Joint is applied between abutting gypsum panels and is used to relieve the stresses of expansion and contraction of drywall and…
Zinc Control Joints #38, #50 & #75
Resists corrosion on applications of plaster and stucco
A solid flange zinc control joint that resists corrosion on interior and exterior applications of plaster and stucco. The #38, #50 & # 75…
Bandmaker™ Series Casing Bead
Designed with a reinforcing rib
Assists in keying heavy material fills when bands are used in architectural designs.
BM 66 Series 1-Piece Bandmaker™
Provides a one-piece band, saving labor time
Additional band widths available.
Archmaker™ / Bandmaker™ Casing Bead
Designed to easily conform to most arched and curved designs
With a reinforcing rib to assist in keying heavy material fills.
Double Flange Step Bead
Finish from the ground on both sides of the bandThe grounds on both sides act as a guide for finishing smooth transitions. Perforated flanges allow for more secure attachment.
093 Vinyl Control Joint
Used to relieve expansion and contraction stresses093 Control Joint provides stress relief and assists in controlling cracking in large areas of wallboard.
E-Flange™ Bandmaker™ Casing Bead
PVC CASING BEAD WITH EMBEDDABLE FLANGE DESIGNE-Flange Bandmaker™ Casing Bead is designed with a reinforcing rib to assist in keying heavy material fills when "bands" are used in architectural designs…
Control Joint with Removable Tape
Recommended for smooth finishesRemovable tape protects the deep "V" groove during construction. J-hooks on the ground helps reduce the effect of plaster shrinkage.